Rengershauser Tunnel temporary track.jpg
From Underfoot
Size of this preview: 800 × 515 pixels. Other resolutions: 320 × 206 pixels | 640 × 412 pixels | 956 × 616 pixels.
Original file (956 × 616 pixels, file size: 144 KB, MIME type: image/jpeg)
File history
Click on a date/time to view the file as it appeared at that time.
| Date/Time | Thumbnail | Dimensions | User | Comment | |
|---|---|---|---|---|---|
| current | 20:29, 26 April 2010 | 956 × 616 (144 KB) | wikimediacommons>Bigbug21 | {{Information |Description={{en|1=A view from the south portal of the Kassel-Oberzwehren fly-over. A temporal track connects the old line (left) with the high-speed line still under construction (right).}} {{de|1=Ein Blick vom Südportal der Überwerfung |
File usage
The following 21 pages use this file:
- Albsliedetunnel
- Schwalbenthaler Neuer Erbstollen mit Entwässerung und Kipphalde
- Wegaer-Tunnel
- Tongrube Braunau
- Steinbruch Schwedenschanze
- Basaltsteinbruch mit Feuchtgebiet
- Germany railway tunnel
- Erbelberg Tunnel
- Kaiserautunnel
- Wildsbergtunnel
- Hessisches Braunkohle Bergbaumuseum
- Lignite Mine at Stolzenbach
- Kreuzungsbauwerk Oberzwehren
- Rauheberg Tunnel
- Tunnel Rengershausen
- Sengeberg Tunnel
- Volkmarshäuser Tunnel
- Schwalbenthal
- Bunkers in Bad Wildungen
- Air-raid shelter am Weinberg
- Bischofferoder Tunnel